Wieuca Road Roundabout

Since 2016, the Buckhead CID and the City of Atlanta have been working together with the public to develop a conceptual design for the Wieuca-Phipps intersection to improve safety, reduce traffic congestion and beautify the public realm. After completing numerous engineering studies, it was ultimately determined that a roundabout is the best alternative. The City of Atlanta will host a public meeting in April to give the community another opportunity to view the concept plan before full design begins. The full design process is expected to take 12 months, and the construction duration will be 12-18 months following the design completion.

Park Over GA400

The survey work for the Park Over GA400 is scheduled to be complete by summer 2019, with preliminary engineering to begin shortly thereafter.

East Paces Ferry Complete Street

Be on the lookout because repaving and new improvements are coming soon!

This project has been in the works since 2017 when the Buckhead CID, in partnership with the City of Atlanta's Renew Atlanta Program, held a groundbreaking ceremony. Visit BuckheadCID.com for updates and announcements of the repaving schedule.

ADA Sidewalk Repairs

The Buckhead CID is planning to begin ADA Sidewalk repairs this summer on five road corridors in Buckhead:
- Roswell Road
- Piedmont Road
- Lenox Road
- Maple Drive
- Pharr Road

The repairs are expected to be complete six to nine months after construction begins. This project is a funding partnership with the Renew Atlanta Bond program.

Click here for ADA project updates.